Water Resource Projects on which ACE engineers have worked include:
- Systems Conveyance and Operations Program, Las Vegas, NV - Work performed by W. Pack for Black & Veatch
- A multimillion dollar project to convey highly treated wastewater effluent
through a pipeline/tunnel system to a new discharge location in Lake Mead
- Modeling performed on the wetlands created behind erosion control structures
to determine water quality changes that would occur as the SCOP system
was put into place to meet regulatory requirements
- Modeling performed on portions of Lake Mead to determine appropriate
mixing zone required to ensure minimal impact on the lake
- SCOP Points of Connection Study, Las Vegas, NV - Work performed by W. Pack for Black & Veatch
- Analysis of potential locations for satellite wastewater treatment
facilities and their associated discharge routes
- Cactus 2538 Zone Reservoir and 2635 Zone Pumping Station, Las Vegas, NV - Work performed by W. Pack for Black & Veatch
- A reservoir and pumping station on which a drainage study was conducted